HI-PE Wins Three Contracts and Take Part in Two Important International Projects

HI-PE has recently acquired three important contracts, two of which concern important projects of international relevance.

The latter provide for the supply of two Waste Heat Boilers destined respectively for the Jubail Export Refinery project in Saudi Arabia (capacity 75 ton/h, pressure 52 Bar, temperature 410° C) and to the Mol Danube project in Hungary (capacity 39 ton/h, pressure 18 Bar, temperature 270° C).

In both cases, HI-PE will be responsible for process engineering, mechanical design, construction and package assembly (which will take place at the Battaglia Terme plant).

The third contract instead involves the supply of an Auxiliary Boiler (capacity 90 ton/h, pressure 50 Bar, temperature 430° C) at the API Refinery in Falconara Marittima (AN).

This order also requires the use of multidisciplinary skills including process engineering, mechanical and instrumentation design, construction, on-site assembly, commissioning and start-up.

The acquisition of these three important contracts demonstrates the ability of HI-PE to offer complete and integrated solutions tailored to the specific needs of each customer and its reputation for reliability and competence in the heaters and boiler sector which make it a trusted partner also for industrial projects of global relevance.

Hungary

KSA